Sr.no |
Group of products, materials or items tested |
Specific tests or types of tests performed |
Specification, standard (method) or technique used |
1 |
Soil, FlyAsh, Moorum, Backfill |
1) Grain Size Analysis Material, GSB & WMM |
IS: 2720 (P4) -1985,RA2010 |
i)Gravel |
ii) Sand |
iii) Silt |
2) Atterberg's Limit |
IS: 2720 (P5) -1985,RA2010 |
i) LL |
ii) PL |
iii) PI |
3)California Bearing Ratio ( CBR ) |
IS: 2720 (P16) -1987,RA2007 |
4) Heavy Compaction |
IS: 2720 (P8) -1983,RA2007 |
i) MDD (Proctor Test) |
ii) OMC |
2 |
ROCK/STONE & AGGREGATE( COARSE & FINE) |
1) Grading (Sieve Analysis) |
IS 2386 (P1)-1963, RA 2002 |
2) Unit Weight & Voids |
IS:2386(P3)-1963, RA 2007 |
(Bulk Density) |
i) Loose Bulk Density |
ii) Compacted Bulk Density |
3) Soundness Test |
IS:2386(P5)-1963, RA 2002 |
i) Coarse Aggregate |
ii) Fine Aggregate |
4) Impact Value |
IS:2386(P4)-1963, RA 2007 |
5) Crushing Value |
IS:2386(P5)-1963, RA 2002 |
6)10% fines Value |
IS:2386(P4)-1963, RA 2007/BS
812 Part -III /EN 1097-8 .2009 |
7)Specific Gravity |
IS:2386(P3)-1963, RA 2007 |
8) Water Absorption Test |
IS:2386(P3)-1963, RA 2007 |
9) Flakiness Index |
IS:2386(P1)-1963, RA 2007 |
10) Stripping Value Test |
IS:6241(P3)-1971, RA 2008 |
11) Free Swell Index |
IS: 2720 (P40) -1977,RA2007 |
3 |
Paving Bitumen & Bitumen Emulsion |
1)Softening point |
IS:1205 -1978,RA 2009 |
2) Penetration Test |
IS:1205 -1978,RA 2010 |
3)Ductility |
IS:1203 -1978,RA 2009 |
4) Viscosity |
|
- Absolute |
IS: 1206(P2)-1978 |
|
ASTM-D-4402-02 |
- Kinematic |
|
|
IS: 1206(P3)-1978 |
|
ASTM-D-4402-02 |
5) Specific Gravity |
IS:1202-1978,RA 2009 |
6) Elastic Recovery |
IS:15462-2004, Annex-A, RA 2009, IRC SP 53-2010 Annex-2 |
7) Test on Residue by Evaporation |
IS:8887-2004, Annex J RA 2009 |
8)Saybolt Furol Viscosity |
IS:3117-2009 |
4 |
Bituminous Mix |
1)Marshall Stability |
AASHTO T245-2004/ASTM D6927-06 |
2) Density (Unit Weight) |
IRC:111-2009, A |
3) Theoretical Maximum Specific Gravity |
IRC:111-2009, Annex-B/ ASTM D 2041 |
4) Marshall Stability Flow |
AASHTO T245 |
5)Retained Stability |
ASTMD 1075 |
5 |
Cement -OPC/PPC |
1) Consistency |
IS:4031 ( P4)-1988, RA 2009 |
2)Setting Time |
IS:4031 ( P5)-1988, RA 2009 |
i) Initial |
ii) Final |
3)Compressive Strength |
IS:4031 ( P6)-1988, RA 2009 |
i) 3 Days |
ii) 7 Days |
iii) 28 Days |
4) Soundness Testing |
IS:4031 ( P3)-1988, RA 2009 |
5) Fineness Test |
IS:4031 ( P1)-2000 |
6 |
Concrete / Cube / Beams/ Blocks |
1) Compressive Strength |
CL.5 ,IS:516,-1959 RA 2008 |